Load incrementally deferred packages on doom/reload

This commit is contained in:
Henrik Lissner 2020-04-14 01:47:20 -04:00
parent 83a95925dd
commit 8f3045b147
No known key found for this signature in database
GPG key ID: 5F6C0EA160557395

View file

@ -77,6 +77,9 @@ Runs `doom-reload-hook' afterwards."
(require 'core-cli)
(when (and IS-WINDOWS (file-exists-p doom-env-file))
(warn "Can't regenerate envvar file from within Emacs. Run 'doom env' from the console"))
;; In case doom/reload is run before incrementally loaded packages are loaded,
;; which could cause odd load order issues.
(mapc #'require (cdr doom-incremental-packages))
(doom--compile (format "%s sync -e" doom-bin)
:on-success
(let ((doom-reloading-p t))